Skip to content
MarrickUnderground & Striping

We dig the street, lay the pipe and stripe it back.

Underground and striping subcontractor for Caltrans, water districts and cities across the Inland Empire since 1998.

In business
28 yrs
Certified
DBEDVBE
License
CSLB A, C-32 #DEMO-718340
An excavator digs a water main trench in a closed road while a pipe crew member in a hard hat and vest watches the edge

Working for Caltrans Districts 8 and 12, Riverside County, Eastern Municipal Water District, Western Municipal Water District, City of Corona, City of Temecula.

From the stripe down

One sub for everything in a street section. Utilities are shown in their APWA locate-paint colors at typical cover depths.

Two workers chain rigging to an excavator bucket to lift a trench shield

Safety record

Deep trenches and night lane closures are where crews get hurt. These are the numbers primes ask for at prequalification.

0.71
Experience modification rate
2026 rate. 1.00 is the industry average; lower is safer.
0.9
Recordable incident rate
OSHA TRIR, 2025, per 200,000 hours worked.
1,140
Days without a lost-time injury
As of November 2026.
Request our safety package

Our own iron

40+ units we own and maintain, so we mobilize on your schedule, not a rental yard's.

See the full fleet
  • E-3030-ton excavatorsLaser grade control, hydraulic thumbs3 unitsDeep storm drain and sewer, loading trucks
  • E-1414-ton excavatorsReduced tail swing for single-lane work5 unitsWater mains and joint trench in traffic
  • BH-4Backhoe loadersExtend-a-hoe, 4x44 unitsServices, laterals and backfill
  • SH-12Trench shields and slide railRated to 20 ft, engineered tabulated data on file12 unitsTrenches 5 ft and deeper
  • DT-810-wheel dump trucksTarped, CARB compliant8 unitsSpoils off-haul and import
  • A pipe crew in hard hats and vests works beside a narrow trench while an excavator lowers a rigging chain over the new water main
    Lowering pipe into a shored water main trenchPhoto: NAVFAC, CC BY 2.0
  • Two workers heat green thermoplastic bike box markings with torches at a night intersection behind cones
    Bike box thermoplastic, laid at nightPhoto: 4300streetcar, CC BY 4.0
  • A worker in a safety vest pushes a thermoplastic stripe applicator, leaving a fresh white line
    Hand liner on a crosswalk stripePhoto: Jim.henderson, CC0
  • A worker torches a green bike box marking at night next to a work truck
    Torching thermoplastic into the pavementPhoto: 4300streetcar, CC BY 4.0

Recent contracts

Water, sewer, storm drain and striping work completed in the last four years.

All projects
Past projects with agency, location, scope and contract value
ProjectAgencyOur scopeContract valueYear
SR-91 restriping and RPM replacementCorona to Riverside, striping subcontractorCaltrans District 841 lane-miles of thermoplastic, 9,800 markers, night work$1,380,0002025
Newport Road water main replacementMenifee, pipeline subcontractorEastern Municipal Water District8,200 LF of 12-inch DIP, 34 services, 6 hydrants$4,260,0002025
Ontario Avenue storm drainCorona, underground subcontractorCity of Corona2,100 LF of 48-inch RCP, 9 catch basins, shoring to 14 ft$2,940,0002024
Ramona Expressway joint trenchPerris, underground subcontractorRiverside County3.1 miles of joint trench and conduit for power and fiber$1,870,0002024
4 contracts shown, total value$10.4M

Where we work

Two yards, in Corona and Perris, put crews anywhere in Riverside, San Bernardino and Orange counties before the 7 a.m. start.

Riverside, San Bernardino, Orange counties

Operators, pipelayers and stripers wanted.

Prevailing wage, year-round work and paid training for OSHA 10, flagger and competent person.